Nashua Street Boost Pump Station

September 18, 2025

 

Completed August 2025

 

A gray water utility building with white shutters, a dark roof, and yellow posts. Set in a sunny, grassy area.

Nashua St Booster Pump Station Project – Milford NH


HAWSCO successfully constructed a 42’ x 34’ Water Booster Pump Station for the Town of Milford NH, delivering the Project from foundation to finish. Yard Piping includes 16” Ductile Iron Pipe, 16” MJ Gate Valves, Suction and Discharge Hydrants, Catch Basin and Drainage System. The station features a CMU Block structure strapped with Hardie Siding and PVC Trim, a Wood Truss system and Standing Seam Metal Roof with Seamless Gutters and Snow Stops for safety.


Interior Features and Mechanical Systems:


  • Equipped with 16” Ductile Iron Water Mains for both inlet and outlet flows.
  • Includes three 60 HP Grundfos VMS Pumps each with a capacity of up to 750 GPM.
  • An Accu-Tab Chlorinator was installed for chemical injection for disinfection.
  • A 14” Stainless Steel KOFLO Static Mixer was installed to properly mic the injected treatment chemical solution.
  • ATI and Hach Analyzers were installed to monitor chlorine levels and PH.
  • A Tempered Water Emergency Eye Wash and Shower Combo Unit was installed for chemical safety purposes.
  • Interior HVAC is automatically controlled by Exhaust Fans and Louvers as well as Gas Unit Heaters.
  • All Pumps and chemical Feed Systems are controlled through Variable Frequency Drives ( VFD’s ) integrated with a SCADA System incorporating adjustable pressure and flow setpoints, water tank levels, and related alarms all with adjustable time delays and ability to contact Water Department personnel in case of emergency.


Power and Backup Systems:


  • Primary power is utility supplied 480 VAC Three Phase connected to custom switchgear with built in surge protection.
  • Backup power is provided by an Automatic Transfer Switch ( ATS ) and a 150 KW Natural Gas Generator.


This state-of-the-art booster pump station enhances water supply efficiency and reliability for the Milford Community, showcasing HAWSCO’s expertise in delivering high–quality water infrastructure projects.


January 6, 2025
Completed December 2024
By HAWSCO February 23, 2024
The Bedford NH Pump Station is a Booster Station that provides Water for domestic use, irrigation and Fire Protection for a new development. HAWSCO performed all work from the Foundation up for a 22’ x 24’ CMU Building that is strapped and sided with Vinyl Siding, new 208 VAC Electric Service, a full HVAC System, REPCO Control System with full Instrumentation and Controls, and a 100 KW Natural Gas Generator.
By HAWSCO February 23, 2024
The Newmarket NH Tucker Well Project consisted of HAWSCO providing and installing a 40 HP 40VAC Submersible Turbine Well Pump complete with Casing Extension, Pitless Adapter and all accessories, providing and installing 7200 Linear Feet of 10” HDPE Water Main with all Hydrants and Gate Valves as required, all required Site Work and restoration for the Water Main installation as well as Drainage and Access Road installation to and from the Well, installation of the Town’s repurposed Generator with LP Tank and accessories, New 480 VAC Electric Service and Poles from the Road to the Station, as well as the Pump Station Building that houses all of the Electrical, Controls and Instrumentation and HVAC Systems complete.
East Road Booster Pump Station
By HAWSCO November 21, 2022
East Road Booster Pump Station HAWSCO is actively engaged with the Southern NH Regional Water Project (SNHRWP) and, as part of the overall project, completed the construction of this booster station in Plaistow, NH. The East Rd Booster station supplies water from the SNHRWP pipeline to the Town of Plaistow at a rate of up to 500 GPM filling the newly constructed 400,000 Gallon Water Tank on Sweet Hill Rd. HAWSCO constructed the Booster Station facility complete from the ground up including but not limited to site work, building construction, installation of the 2 Booster Pumps, all related piping, valves, instrumentation, sampling equipment and electrical control panels for the Town of Plaistow. There are two 20 HP Domestic Water Pumps that deliver 500 GPM each at 95’ TDH through 12” Ductile Iron Mains. This station is designed to automatically maintain programmed level setpoints in the Sweet Hill Water Tank with variable flows of 0-500 GPM through VFD’S and a SCADA Control System with a local SCADA control panel with a Touchscreen Operator Interface and remote SCADA PC’s with a fully programmable control system and alarm call out system.
Plaistow NH Water Tank Construction
By HAWSCO June 21, 2021
P3 – Plaistow NH Sweet Hill Tank Furnish and install a new 400,000 gallon Water Storage Tank Project complete with Valve Vault Building, connection to 12” Water Main, HVAC and Electrical Controls, Paving, Fencing and Site Restoration.
Bedford Booster Station
By HAWSCO February 3, 2021
Amidst a global pandemic in 2020, HAWSCO mechanically installed the 5 Booster Pumps, all related piping, valves, instrumentation, and control panel for the Bedford Assisted Living Facility Bowman Place.
Derry Booster Pump Facility Interior
By HAWSCO October 29, 2020
As part of the overall Southern NH Regional Water Project (SNHRWP) HAWSCO completed the construction of this 3,200 gallons per minute pumping station in Derry, NH.
Water Treatment Facility
By HAWSCO June 30, 2020
The Rockingham Road Booster Pumping facility is an integral component of the Southern New Hampshire Regional Water Interconnection Project, and with upgrades will now support the introduction of water to Salem’s, HAWC and ultimately the Plaistow water system.
Atkinson 1MG Water Tank and Meter Building
By HAWSCO June 10, 2020
The Atkinson Water Tank is a major component of the Southern New Hampshire Regional Water Interconnection Project, storing 1 million gallons of potable water for the Hampstead Area Water Company, Inc.’s (HAWC) core water system.