Newmarket NH Tucker Well Project
Completed August 2023

Newmarket NH Tucker Well Project
The Newmarket NH Tucker Well Project consisted of HAWSCO providing and installing a 40 HP 40VAC Submersible Turbine Well Pump complete with Casing Extension, Pitless Adapter and all accessories, providing and installing 7200 Linear Feet of 10” HDPE Water Main with all Hydrants and Gate Valves as required, all required Site Work and restoration for the Water Main installation as well as Drainage and Access Road installation to and from the Well, installation of the Town’s repurposed Generator with LP Tank and accessories, New 480 VAC Electric Service and Poles from the Road to the Station, as well as the Pump Station Building that houses all of the Electrical, Controls and Instrumentation and HVAC Systems complete.
This 40 HP Well Pump delivers 275 GPM @ 381’ TDH to the Newmarket Water Treatment Plant where is goes through the Treatment Process and out to the Town via Booster Stations. The Well Pump is controlled by a VFD and SCADA System with several parameters and alarms which communicates directly with the Town’s SCADA System at the Water treatment Plant. HAWSCO performed all work from the Foundation up for the Pump Station Building which is a 20’ x 30’ CMU Building that is Strapped and Sided with Fiber Cement Siding with new 200 AMP 480 VAC Electrical Service, a full HVAC System, SCADA System with full Instrumentation and Controls, 80 KW LP Gas Generator and 1000 Gallon LP Gas Tank, and room for future upgrades and / or chemical addition.